DOF SUBSEA'S SHIP AGENCY

DOF SUBSEA'S SHIP AGENCY

Views: 48

Engineering and Constuction / Installation for oil & gas and wind farm offshore project.

DOF has successfully implemented many projects around the world including projects in Vietnam as listed below

 

Project DOF Client End Client Scope of Work DOF Vessel Country Period Water Depth
Rong Doi MV12 Mooring Repair PTSC PTSC - PetroVietnam Technical Services Corporation Phase 1. Replacement of 8 x Mooring Chains using Skandi Hercules with ACCD. Phase 2 Skandi Singapore, Skandi Hercules Vietnam Sep-20 85 m
Flexlay and MDB Installation TSC Asia Pacific Pte Ltd PTSC PertoVietnam Teechnical Services Corporation DSV Services for a Mid depth buoy installation and Flexible 6”and 8” Riser/Umbilical Installation using Sat Diving and ROV techniques. Skandi Hercules Vietnam Nov-17 70 m
Lam Son - FPSO Hookup - Ph 2 TSC Asia Pacific Pte Ltd PTSC PertoVietnam Teechnical Services Corporation DSV Services for a Mid depth buoy installation and Flexible 6”and 8” Riser/Umbilical Installation using Sat Diving and ROV techniques. Skandi Hercules Vietnam Nov-17 70 m
Lam Son - FPSO Hookup& - Ph 2 PTSC POS Co. Ltd PTSC Offshore Services Co. Ltd Phase 2. Tow and hook up of FPSO Lam Son, Load out, transportation and installation of risers and umbilicals. Propose Skandi Singapore. Skandi Singapore Vietnam May-14 70 m
Bien Dong
- Ph 1 Mooring Installation
- Ph 2 FSO Hook up & tie in
PTSC PTSC Vietnam Phase 1. Installation of the mooring system, including all installation
PM&E.
Phase 2. Tow and hook-up of FSO
Vietnam Oct-12 150 m
Te Giac Trang Field Development FPSO Installation Phase 1B/2 PTSC Offshore Services Vietsovpetro Joint Venture Phase 2 Hook up of the FPSO to the mooring system, inclusing all
PM&E and installation of associated flexible risers.
Skandi Singapore Vietnam Aug-11 45 m
Bien Dong - Pre-laid Mooring PTSC Vietnam PTSC Vietnam Pre-laid Mooring of BD1 Drilling Programme Skandi Hercules Vietnam Jul-11 150 m
Te Giac Trang FPSO Installation Phase 1B/2 PTSC Offshore Services Vietsovpetro Joint Venture Phase 1 Installation of the mooring system, inclusing all installation
PM&E
Skandi Hercules Vietnam Jun-11 45 m
Ruby 2 FPSO Installation Project Phase 1 & 2 PTSC Vietnam PTSC Vietnam • Installation of nine chain/anchor pile mooring system
• Structures installation including pipeline end Manifolds (PLEMs)and seven riser tether bases;
• Tow and hookup of FPSO to mooring spread
• Installation and tie in of 7 risers, 1.9km flexible flowline, 2 rigid dog leg spools and a rigid platform riser
• Pre commissioning post installation
N/A Vietnam May-10 50 m

Regional and Global Vessels

 

PSV/AHTS Fleet
• Skandi Feistein (PSV)
• Skandi Emerald (AHTS)
• Atlantic (AHTS
Subsea Fleet_01
Subsea Fleet_02
Subsea Fleet_03
Subsea Fleet_04
Subsea Fleet
• Skandi Darwin (MPSV & W2W)
• Skandi Singapore (DSV)
• Skandi Hercules (CSV AHT)
• Skandi Hawk (MPSV)
Subsea Fleet_01
Subsea Fleet_02
Subsea Fleet_03
Subsea Fleet_04
Global Assets
• Skandi Acergy
• Skandi Constructor
• Skandi Africa
Global Assets_01
Global Assets_02
Global Assets_03

Service Delivery Capability Model

The DOF Subsea service delivery provides a single source solution.

                     Project Management and Engineering

Supply chain management

 

Supply chain management

Marine Vessel ownership and management
 

Marine Vessel ownership and management

Survey, Remote Intervention and Inspection Services

Survey, Remote Intervention and Inspection Services

Construction and Installation Services
 

Construction and Installation Services

Moorings

 

Moorings

EPCI/SURF

 

EPCI/SURF

Air and Saturation Diving Services

Air and Saturation Diving Services

Decommissioning Services
 

Decommissioning Services

Renewables: Floating Wind & Fixed Wind

Renewables: Floating Wind & Fixed Wind

SURF / Construction Support : Skandi Acergy

SURF / Construction Support : Skandi Acergy
Skandi Acergy
• DP3 Vessel
• Large deck space (2100m2) to accommodate project spread
• 3000t under-deck carousel
• Primary crane: 400t AHC knuckle
• Secondary crane: 100t AHC knuckle
• 2 x WROVs (dedicated moonpools for launch / recovery)
• Accommodation for 140 pax
• Helideck (CAP437 compliant)

Deepwater Subsea Construction Vessel: Skandi Africa

Deepwater Subsea Construction Vessel: Skandi Africa
Skandi Africa
• DP3 Vessel
• 650 t top tension tower, 720 t A&R
• Large deck space (2500m2) to accommodate project spread
• 3500t under-deck carousel
• Primary crane: 900t AHC knuckle
• Sec. crane: 150t AHC knuckle
• 2 x WROVs (dedicated moon-pools for launch / recovery)
• Accommodation for 140 pax
• Helideck (CAP437 compliant)

Skandi Hercules Vessel

Skandi Hercules Vessel

Skandi Singapore Vessel

Skandi Singapore Vessel

Detail: Services of ViNaVan

Scroll